Yamaha YZ85( P) /LC Owner's Service Manual page 310

Hide thumbs Also See for YZ85( P) /LC:
Table of Contents

Advertisement

CRANKCASE AND CRANKSHAFT
5PA41760
5PA41770
5PA41780
4 - 58
4. Install:
Dowel pin 1
Right crankcase 2
To left crankcase 3.
NOTE:
Turn the shift cam 4 to the position shown in
the figure so that it does not contact the
crankcase when installing the crankcase.
Fit the right crankcase onto the left crank-
case. Tap lightly on the case with soft ham-
mer.
When installing the crankcase, the connect-
ing rod should be positioned at TDC (top
dead center).
5. Install:
Clamp 1
Screw (crankcase) 2
8 Nm (0.8 m · kg, 5.8 ft · lb)
NOTE:
Tighten the crankcase tightening screws in
stage, using a crisscross pattern.
6. Remove:
Sealant
Forced out on the cylinder mating surface.
7. Apply:
Engine oil
To the crank pin, bearing, oil delivery hole
and connecting rod end washer.
8. Check:
Crankshaft and transmission operation
Unsmooth operation
ENG
Repair.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents