Control Circuit And External Interface Connections 50 Kva; Figure 6-8 50Kva External Interface Assignments - Toshiba 4200FA Installation And Operation Manual

Three-phase 15/25/30/50 kva ups
Hide thumbs Also See for 4200FA:
Table of Contents

Advertisement

6.4

Control Circuit and External Interface Connections 50 kVA

The following illustrates the wiring connections of the Control Circuits, and Battery Interface Circuits for
the 50kVA.
NOTE: Control circuit wiring should be routed in it's own conduit. Do not route control circuit wiring
through conduit containing UPS power cables.
(These terminals not available on Base units)
(1) Low Battery
(2) Battery Discharge
(3) Fault
(4) Not Used
(5) Inverter Supply
(6) Inverter Supply
(7) 24Vdc – 1A max. (P24A3)
(8) Remote Run (Switch UPS to Inverter Mode)*
(9) 24Vdc – 1 A max. (P24A3)
(10) Remote Stop (Switch UPS to Static Bypass)*
32

Figure 6-8 50kVA External Interface Assignments

(These terminals
on ALL units)
(3) Battery Shunt Trip
(4) Battery Shunt Trip
(5) Battery Aux
4200FA Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents