6.3.2
Power Cable Routing and Conduit Placement 50 kVA
The following illustrates the proper cable routing that should be followed during the power connection
process for the 50kVA.
Note: Cabinet show with batteries, cabling is the same for units with internal batteries, internal
transformers, and neither internal batteries nor transformers.
Figure 6-7 50kVA Cable Routing and Terminal Location
4200FA Installation and Operation Manual
31