4.4

Unpack the Base and Seismic 50 kVA UPS (without Casters)

4200FA 50kVA Base (P/N T42F3F500XAXXN , T42F3F500XAXBN)
4200FA 50kVA Seismic (P/N T42F3F500XAMX0S)
Upon receipt of the UPS, a careful inspection for shipping damage should be made. Units shipped within
North America and NAFTA are shrink-wrapped; those outside North America are crated.
1. Remove the shrink wrap from the UPS and Pallet.
2. Unbolt the UPS from the shipping pallet.
3. Position the forks between the C-channel feet on the bottom of the 50kVA UPS cabinet. (front or
back access)
4. Lift the UPS off the pallet.
5. Use the forklift/floor jack to position the UPS on the pre-drilled mounting holes. See Section 2.7
Seismic Version has two outer and a center C-channel skid
Base Version has two outer C-channel skids but NO center skid
DANGER
14

Figure 4-1 Offload 50kVA UPS (No Casters)

TOP HEAVY EQUIPMENT – DO NOT tilt the UPS more than 10° from the
upright position.
Tilting the UPS more than 10° may cause crushing, trapping, or other
personal injuries and cause physical damage to internal components.
THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE.
Center C-channel skid
(Seismic version only)