Power Connection Cable Routing and Conduit Placement 50 kVA

The following illustrates the proper cable routing that should be followed during the power
connection process for the 50kVA.
Note: Cabinet show with batteries, cabling is the same for units with internal batteries, internal
transformers, and neither internal batteries nor transformers.