Power Connection Cable Routing - Toshiba 4200 series Operation Manual

Uninterruptible power system three phase- 75/100kva ups
Table of Contents

Advertisement

4.1.2
Top Conduit Entry
Main Input
Main MCCB
Main Input (N)
Output
Ground
Bottom Conduit Entry
Note:
1) Input and Output conductors shall be installed in separate conduits, and installed in
accordance with the latest edition of NEC and the authority having jurisdiction.
2) Battery conductors shall be installed in a separate conduit and be of low resistance type.
TOSHIBA

Power Connection Cable Routing

The following illustrates the proper cable routing that should be followed during the
power connection process of the 75 and 100kVA.
15