Unpacking the new UPS equipment 50 kVA:

Upon receipt of the UPS, a careful inspection for shipping damage should be made. Units
shipped within North America are shrink-wrapped; those outside North America are crated.
3. Place the tie brackets in the slots at
the lower end of the ramps.
SLOWLY roll the unit down th
ramp.
DANGER
4200FA CT/XT User's Manual
TOSHIBA
1.
Remove packing material.
1a.
For international units, remove
the screws that attach the
shipping crate to the pallet.
Remove the crate and foam
packing material.
2. Unbolt the rails from both the unit
and the shipping pallet.
Place the rails on the front of
the pallet.
Use the four 1/2 x 3" bolts to
secure the rails to the shipping
pallet.
Attach the rails as shown in the
front to the front of the pallet.
e
TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH.
LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE EQUIPMENT AND TRAINE
PERSONNEL. THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE.