NEC Express 5800 User Manual page 52

Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

4-10
Windows Setup
<When the AC power is off (The power cord is not plugged into the outlet)>
Connect the power cords to NEC Express5800/ft series in the following order:
(1) Connect the power cord to the AC inlet B (for Group1)
(2) Connect the power cord to the AC inlet A (for Group2)
(3) Confirm that the POWER switch of the PCI module for Group1 is illuminated.
(4) Make sure that the two BMC Status LEDs for PCI modules (for Group1/for Group2) are
turned off.
IMPORTANT:
step after the LED is turned off. Otherwise the setup may not be done properly.
Preparation is now completed. Start the ft series setup.
<When the AC power is on (The power cords are plugged to the wall outlet and the main
unit's power is off)>
(1) Check the LED of the PCI module's POWER switch.
If the PCI module for Group1's POWER switch is lit, PCI module for Group1 is
primary. Preparations are complete. Go on to Step 3 "Disable Boot Monitoring
Function."
If the PCI module for Group2's POWER switch is lit, the PCI module for Group1 is
secondary. Continue to (2). Make PCI module for Group1 the primary module.
Rear View
If the BMC Status LED is red and blinking, go on to the next
AC inlet B (for
Group1)
AC inlet A (for
Group2)

Advertisement

Table of Contents
loading

Table of Contents