Installing A New Multi-Module Library Configuration; Preparing To Install A Multi-Module Library - Dell PowerVault ML6010 Troubleshooting Manual

Tape library
Hide thumbs Also See for PowerVault ML6010:
Table of Contents

Advertisement

Installing, Removing, and Replacing
4
Open the library's I/E station door and access door. Lift the 5U Library Control Module and place it in the desired
location.
5
Use the rack ears to fasten the 5U Library Control Module to the rack. For instructions, see
Module in the
Rack.
6
If not already installed, install the library control blade (LCB) in the 5U Library Control Module. See
Replacing the Library Control Blade and LCB Compact Flash Card
7
Add the tape drives to the module.
8
Install the power supplies. See
supplies.
9
Close the library's I/E station door and access door.
10
Connect all power cords and network data cables. See
11
Install module terminators in the top and bottom module terminator connectors. See
information on installing the module terminators.
12
Power on the library.
13
Configure the library using the operator panel Setup Wizard.
14
Add the tape cartridges to the library using the I/E station.
15
If your host application inventories the location of each tape cartridge in the library, open the host application and re-
inventory to sync the logical inventory with the physical inventory of the library.

Installing a New Multi-Module Library Configuration

Use this procedure for installing a new multi-module library. A multi-module library contains a 5U Library Control Module and
one or two 9U Library Expansion Modules.
There are no restrictions on where the 5U Library Control Module can be installed in the library configuration. However, the
recommended placement of the control module for library configurations up to 32U is on top of all installed 9U expansion
modules. The recommended placement of the control module for 41U library configurations is on top of three 9U expansion
modules and below the top expansion module.
9U Library Expansion Module
5U Library Control Module
9U Library Expansion Module
9U Library Expansion Module
9U Library Expansion Module
Warning:
All libraries taller than 14U must be installed in a rack having a main protective earthing
(grounding) terminal, and power must be supplied via an industrial plug and socket-outlet and/or an
appliance coupler complying with IEC 60309 (or an equivalent national standard) and having a protective
earth (ground) conductor with a cross sectional area of at least 1.5 mm 2 (14 AWG).
To ensure proper airflow and access space, Allow 60 cm (24 inches) in the front and back of the library.

Preparing to Install a Multi-Module Library

Required tools:
Phillips #2 screwdriver, for removing and replacing the top cover plate
file:///T|/htdocs/stor-sys/ML6000/en/html/ch08.htm[9/17/2012 1:50:35 PM]
Adding, Removing, and Replacing Power Supplies
Cabling the
for instructions on installing the LCB.
for instructions on installing power
Library.
Cabling the Library
Installing the Bottom
Removing and
for

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powervault ml6000

Table of Contents