Cable Management Guidelines; Cable Management Kit - Dell PowerVault ML6010 Troubleshooting Manual

Tape library
Hide thumbs Also See for PowerVault ML6010:
Table of Contents

Advertisement

Installing, Removing, and Replacing
from the 5U Library Control Module.
d
Connect the module-to-module cable from the 5U Library Control Module to the 9U Library Expansion Module.
5
Connect your Ethernet cable to the Gigabit (GB) Ethernet port on the library control blade (LCB) for remote access to
the library via the Web client.
6
Connect a power cord to the outlet on the power supply on the rear of the library.
There should always be a power cord connected to the power supply on the 5U Library Control Module. If redundant
power supplies are used, connect a power cord to each of the additional power supply outlets.
7
Plug the power cord into a nearby AC power source.
8
Power on the library.
a
Turn on the rear power switch of each of the power supplies.
b
Turn on the front power button.
c
Power up the host system.
9
Verify communication with all devices on the bus.
10
Configure the library using the commands on the operator panel. See configuration information in
Library.

Cable Management Guidelines

As the library expands to support larger configurations, it is important to restrain and organize cables and power cords on the
rear of the library. Doing so ensures that the rear of the library remains accessible and reduces the possibility that cables
become damaged.
Use this section to find cable management guidelines and best practices for power cords and Ethernet cables. Use the
equipment specified in the
Library Cabling for FC I/O

Cable Management Kit

If you purchase a Fibre Channel I/O blade, you will receive a cable management kit with all the equipment necessary to
perform these procedures. You can also order the cable management kit from Dell (see
information). The color of the straps matches the color of the cords they are designed to secure.
Component
file:///T|/htdocs/stor-sys/ML6000/en/html/ch08.htm[9/17/2012 1:50:35 PM]
Cable Management Kit
section below. For recommended cabling of tape drives, see
Blades.
Description
Black hook-and-loop fastener — Secures power cords to 9U Library Expansion
Modules.
Blue hook-and-loop fastener —Secures Ethernet cables to 9U Library Expansion
Modules.
Push-in clip — to secure hook-and-loop fasteners to 9U Library Expansion
Modules.
Configuring Your
Recommended
Contacting Dell
for contact
Quantity
1
1
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powervault ml6000

Table of Contents