Troubleshooting
Get/Put Test
The Get/Put Test requires the robot to remove one tape cartridge from the top I/E station slot, and then put the tape
cartridge back into the same slot. To run this test, you must insert a tape into the library's top (uppermost) I/E station slot.
Robotics tests cannot be performed from the operator panel. The path to open the appropriate screen is as follows:
•
From the Web client, select Tools > Diagnostics > Robotics > Robotics Get/Put Test.
Back to Contents Page
file:///T|/htdocs/stor-sys/ML6000/en/html/ch09.htm[9/17/2012 1:50:53 PM]