NEC Express5800/140Rc-4 User Manual page 298

Table of Contents

Advertisement

9-12 Upgrading Your Server
6.
Connect two power cords.
Use the power cord provided with the standard power supply unit and the one provided
with the optional unit. The AC Standby lamps (the SB1 and SB2 lamps) go on when the
power cords are connected.
IMPORTANT:
Dust cover is attached to the AC inlet 2 connector. Keep the
removed dust cover for future use.
Fasten the power cords with the lock spring.
AC Standby lamps (SB1 and
SB2 lamps) go on.
7.
Power on the server.
The POWER lamp on the power supply units goes on. When the server is redundant
power supply configuration, AC_R lamp on the front of the server goes on.
8.
Confirm, by the STATUS lamp or on the POST diagnostic screen, that there are no errors
related to the power supply units.
See Chapter 8 for details on the error messages.
If the POWER lamps are off, reinstall the power supply units. If the POWER lamps are
still off, contact your sales representative.
AC inlet for additional power
supply unit

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8100-1023fN8100-1024f

Table of Contents