Using Your Storage And I/O Blade; Power-On Of Storage And I/O Blade; Power-Off Of Storage And I/O Blade - NEC Express5800 series User Manual

Express5800 series storage and i/o blade ad106a
Hide thumbs Also See for Express5800 series:
Table of Contents

Advertisement

USING YOUR STORAGE AND I/O BLADE

This section describes the basic operation of the Storage and I/O Blade.
The power of the Storage and I/O Blade is automatically controlled in linkage with the power of
CPU blade. Refer to the manual that comes with your CPU blade for power on/off of the Storage
and I/O Blade.

Power-on of Storage and I/O Blade

The power of the Storage and I/O Blade is automatically controlled in linkage with the power of the
connected CPU blade. Refer to the manual that comes with your CPU blade to power on the Storage
and I/O Blade.
IMPORTANT:
either the use of the POWER switch or the remote power-on after the
period of 30 seconds or longer has passed from the supply of AC power
to CPU blade and Storage and I/O Blade. The POWER lamps on CPU
blade and Storage and I/O Blade goes on amber if they are powered on.
The power-on operation within the period of 30 seconds from the
supply of AC power to them may not turn on the power of the CPU
blade. If so, turn on the power of the CPU blade by using the POWER
switch after making sure that the AC power is supplied to CPU blade
and Storage and I/O Blade.
NOTE:
power controller including an uninterruptible power supply (UPS),
make sure that the power of the power controller is turned on.

Power-off of Storage and I/O Blade

The power of the Storage and I/O Blade is automatically controlled in linkage with the power of the
connected CPU blade. Refer to the manual that comes with your CPU blade to power off the
Storage and I/O Blade.
Perform the power-on operation of the CPU blade by
If a power cord on the Blade Enclosure is connected to a
General Description 2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8404-001f

Table of Contents