NEC Express5800 series User Manual page 154

Express5800 series storage and i/o blade ad106a
Hide thumbs Also See for Express5800 series:
Table of Contents

Advertisement

9-8
Upgrading Your Storage and I/O Blade
5.
Remove the two screws fixing the top cover.
6.
Firmly hold the cover, move it slightly toward the rear of the blade, then lift the cover to
remove it from the Storage and I/O Blade.
IMPORTANT:
with any electronic components on the Storage and I/O Blade.
7.
Make sure the location of mezzanine card slot you are going to install.
Handle the cover carefully so as not to make it contact

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8404-001f

Table of Contents