Tippmann A-5 MARKER LINE Owner's Manual page 13

A-5 marker line
Table of Contents

Advertisement

Available languages

Available languages

Receiver Disassembly Assembly (continued from page 21)
2 lower receiver push pins
and pull grip from upper
E
receiver
.
❏ To remove the gas line
N
a remote coil) and the Tombstone
G
adapter
from the upper
L
receiver: Remove push pin
in front of the Tombstone from the
I
upper receiver, release the
S
Tombstone Latch
and the gas
line
/ Tombstone adapter
H
will pull out. NOTE: If you remove
the gas line plug
from the
Tombstone adapter
; when
reinstalling, clean, inspect and
oil the o-ring and be careful not to overtighten and strip threaded parts.
Drive Assembly Removal and Installation:
NOTE: It is not necessary to disassemble the upper receiver
and service the drive assembly internal parts .
❏ To remove the drive assembly parts: front bolt
valve
; rear bolt
/ rear bolt plug
guide
; drive spring
; and end cap
1) ❏ Remove air supply before any disassembly: First follow ❏
Unloading Your Marker and ❏ Air Supply Cylinder Removal
instructions on pages 18-20 and put the marker in the uncocked position
before beginning to disassemble it. To uncock the marker, pull and
hold the bolt cocking handle
slowly release the handle forward
2) ❏ Remove lower receiver (grip) and gas line as instructed - see page 21).
3) ❏ Screw the velocity screw
4) ❏ Remove last push pin
stock) in place.
5) ❏ Pull the end cap
(or collapsible stock) out and tilt marker up,
the drive assembly parts
should slide out the back.
To remove valve
from power tube: carefully push valve out
/
(or
NOTE: Carefully hand
Allen Wrench
start all threaded parts
and do not overtighten
and strip threaded parts
when assembling.
RIGHT SIDE VIEW
; power tube
; linkage arm
(or collapsible stock).
back
- then pull the trigger and
which will uncock the marker.
in past the receiver (3/16"
holding the end cap
(or the collapsible
with allen wrench.
22
Drive Assembly Removal and Installation:
(continued on page 23)
Drive Assembly Removal and Installation: (continued from page 22)
❏ To reinstall the drive assembly parts:
1) ❏ Clean inside the upper receiver and the removed parts.
2) ❏ Inspect and replace any damaged parts. ❏ Lubricate the front bolt o-
ring, the valve o-ring, the rear bolt o-ring, the linkage arm and the drive
spring/guide pin with a few drops of Tippmann
premium paintball marker oil) before reinstalling.
3) ❏ Insert the valve
with the Tombstone cutout
to match the power tube cutout
Tombstone adapter
Insert rear bolt plug
4) ❏ Insert reassembled parts:
power tube/valve, rear bolt/rear bolt plug, with linkage arm facing up, until
the Tombstone adapter/gas line
and velocity screw
while sliding parts in.
5) ❏ Insert the guide pin into the drive spring
to access
drive spring into the rear bolt plug
stock), while keeping the guide pin centered in it. ❏ Install the upper end
/
cap push pin
; drive pin
LOWER RECEIVER (grip or E-Grip
❏ Follow the Marker / Receiver Disassembly instructions on pages 21-22
until you have ❏ detached the lower receiver
To remove the trigger assembly
from the grip
out of the left side of the grip
(on E-Grip
straight up
side of lower receiver). ❏ Pull up on the trigger
assembly
).
To access trigger assembly parts: ❏ Pull the left
plate
not remove 5 dowel pins from right plate, see
trigger assembly on page 17 (for E-Grip
Assembly see page 24).
❏ To disassemble the lower receiver
1) ❏ Remove bolt
short) and (
2) ❏ Remove the 3 grip screws
❏ To reassemble the lower receiver
1) ❏ On A-5
❏ On A-5
parts are in place and o-rings lubricated (see page 14).
into the power tube
aligned down
. ❏ Insert
to check the fit. ❏
into rear bolt
.
can be inserted, push pin
can be accessed. You may need to jiggle marker
. ❏ Insert the end cap (or collapsible
.
TM
) Disassembly/Assembly:
: ❏ Push the Safety
: rotate the Safety Selector Switch
TM
and ❏ pull it out of the left
keeping it intact.
off the trigger assembly
Trigger
TM
:
( and on E-Grip
TM
remove 2 tank adapter bolts (
long) and remove the tank adapter
holding the two lower halves together.
(E-Grip
TM
Basic Make sure the trigger guard
TM
TM
Response
: make sure trigger guard
23
paintball marker oil (or other
®
(front bolt,
replaced
and ❏
.
E-Grip
TM
. Do
/ gas line
.
TM
Shown - page 24):
is in place.
and Response
To reassemble the lower receiver
(continued on page 24)
E
N
G
L
I
S
H

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents