Intergraph InterServe 9000 System Reference Manual page 26

Hide thumbs Also See for InterServe 9000:
Table of Contents

Advertisement

16
5. If using an AC distribution box or UPS, connect its power cord to a grounded, three-
prong AC power outlet.
NOTE
The UPS starts automatically when its power cord is connected to the power outlet. Refer to
the UPS documentation for more details.
6. Connect other cables as necessary for printers (parallel port), external SCSI devices
(SCSI port), and modems or UPS communication (serial ports).
7. Install the disk drives as described in the next section.
AC Receptacle
AC Receptacle

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the InterServe 9000 and is the answer not in the manual?

Table of Contents