Figure 12 Ce Wiring Part 2 - Honeywell HercuLine 2000 Series Installation, Operation And Maintenance Manual

Hide thumbs Also See for HercuLine 2000 Series:
Table of Contents

Advertisement

Installation
Electrical Installation
Step
AC power connection
8
Auxiliary switches connection
Relay contact connection
Install new gasket and top cover. Secure top cover with 6 captive screws.
9
Reapply AC power to the actuator.
10
Actuator is ready for use.
11
Input Signal Connections
ATTENTION
Shielded and grounded cables are recommended.
0/4-20 mA Input Signals
For current signal input, ensure jumper W2 on the CPU PWA is in the "Current" position. See Figure 27 on
page 68. Observing polarity, connect the signal input wires TB3–4(+) and TB3–5(-) on CPU terminal board.
0/1-5 Vdc and 0 to 10 Vdc Input Signals
For voltage signal input, ensure jumper W2 on the CPU PWA is in the "Voltage" position. See Figure 27 on
page 68. Observing polarity, connect the signal input wires to terminals TB3–4(+) and TB3–5(-) of the terminal
block.
22
HercuLine™ 2000 Series Actuator - Installation, Operation and Maintenance Manual
Action
Aux switches
1 and 2
(SW3 and SW4)

Figure 12 CE Wiring part 2

Aux switches 3
and 4
(SW5 and SW6)
Relays 1 and 2
Relays 3 and 4
AC power
connection
Revision 7
7/08

Advertisement

Table of Contents
loading

Table of Contents