Table C-5 Site Inspection Checklist - HP L1000 - 9000 - 0 MB RAM User Manual

User guide - hp rp5400 family of servers
Hide thumbs Also See for L1000 - 9000 - 0 MB RAM:
Table of Contents

Advertisement

Table C-5
Site Inspection Checklist
Please check either Yes or No. If No, include comment# or date
Computer room
No.
Area or condition
1.
Is there a completed floor plan?
2.
Is there adequate space for maintenance needs?
Front 36 in (91.4 cm) minimum, Rear 36 in
(91.4 cm) minimum are recommended
clearances.
3.
Is access to the site or computer room
restricted?
4.
Is the computer room structurally complete?
Expected date of completion?
5.
Is a raised floor installed and in good condition?
6.
Is the raised floor adequate for equipment
loading?
7.
Are there channels or cutouts for cable routing?
8.
Is there a remote console telephone line
available with an RJ11 jack?
9.
Is a telephone line available?
10.
Are customer supplied peripheral cables and
LAN cables available and of the proper type?
11.
Are floor tiles in good condition and properly
braced?
12.
Is floor tile underside shiny or painted? If
painted, judge the need for particulate test.
Power and lighting
No.
Area or condition
13.
Are lighting levels adequate for maintenance?
14.
Are there AC outlets available for servicing
needs? (i.e. vacuuming)
15.
Does the input voltage correspond to equipment
specifications?
15A
Is dual source power used? If so, identify type(s)
and evaluate grounding.
Appendix C
General Site Preparation Guidelines
Comment
or Date
Yes
No
Yes
No
Site Inspection
209

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp5400

Table of Contents