Installing the System
Cabling and Powering On the Server
Table 2-6
Factory-Integrated Installation Checklist
Procedure
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
Inspect shipping containers
for damage
Unpack cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Unpack the peripheral
cabinet (if ordered)
Unpack other equipment
Remove and dispose of
packaging material
Move cabinet and equipment
to computer room
Move cabinet into final
position
Position cabinet next to
each other (approx. 1/2
inch)
98
In-process
Initials
Comments
Completed
Initials
Comments
Chapter 2
Need help?
Do you have a question about the Integrity rx8640 and is the answer not in the manual?