FRONT WHEEL/FRONT FORK/STEERING
INSTALLATION
STEEL BALLS
STEEL BALL RACE
STEEL BALL RACE
STEEL BALLS
BOTTOM CONE RACE
DUST SEAL
WASHER
14-22
STEERING HEAD TOP THREAD
TOP CONE RACE
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
STEERING STEM
Apply grease to top and bottom ball races and install
the steel ball assy.
Instert the steering stem into the steering head pipe.
Insall the steel ball and top cone race.
Tighten the steering head top thread.
TORQUE : 2.5 kgf m (INITIAL TORQUE)
TOOL : STEERING STEM SOCKET
Move the steering stem right and left, five times to seat
the steel balls.
Retighten the steering head top thread to the specified
torque.
TORQUE : 0.3 kgf m (FINAL TORQUE)