Two jumper cables (C19-C20) are provided to connect from the switch to the PDU. The
recommended power cords to connect from the PDU to the wall are E7803A, E7805A,
E7806A, E7808A, and E7809A.

Installing the switch as a stand-alone unit

The following items are required for this setup:
Core Switch 2/64 or SAN Director 2/128
AC power cords and cables supplied with the switch

Removing the chassis door

CAUTION:
(See
Figure 4
1.
Open the door to a 90° angle.
2.
Push the spring-loaded lever on the upper hinge up and into the notch in the hinge.
Push the spring-loaded lever on the lower hinge down and into the notch in the hinge, while
3.
supporting the door to prevent it from falling.
Figure 4

Sequence for detaching the chassis door from the hinges

30
Installing and configuring the switch
You must remove the chassis door before lifting the chassis off the pallet.
for an illustration of the complete chassis door removal sequence.)