Appendix D
HP NetServer LH Pro and LH II
CAUTION
To remove or install mass storage cables to an HP NetRAID
Series adapter in this HP NetServer, you must first remove
the power supply(s). Follow the procedures in your system's
road map or in Information Assistant to successfully remove
and replace the power supplies. Failure to follow these
procedures may result in breaking the power management
board.
Non-Duplex Cabling
Figure D-4. Non-Duplex Cabling of HP NetServer LH Pro or LH II with an
154
HP NetRAID-1 Adapter
Cabling Diagrams