Enabling Full Memory Tests; Catalyst Software - Cisco IPS-4255-K9 - Intrusion Protection Sys 4255 Installation Manual

Intrusion prevention system appliance and module installation guide for ips 7.0
Table of Contents

Advertisement

Enabling Full Memory Tests

Blank faceplates and cover panels serve three important functions: they prevent exposure to
Warning
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place. Statement
1029
For More Information
Enabling Full Memory Tests
When the IDSM2 initially boots, by default it runs a partial memory test. You can enable a full memory
test in Catalyst software and Cisco IOS software. This section describes how to enable memory tests,
and contains the following topics:

Catalyst Software

Use the set boot device boot_sequence module_number mem-test-full command to enable a full
memory test. The full memory test takes about 12 minutes. To enable a full memory test, follow these
steps:
Log in to the console.
Step 1
Enter privileged mode.
Step 2
console> enable
Enable the full memory test.
Step 3
console> (enable) set boot dev cf:1 3 mem-test-full
Device BOOT variable = cf:1
Memory-test set to FULL
Warning: Device list is not verified but still set in the boot string.
console> (enable) set boot dev hdd:1 3 mem-test-full
Device BOOT variable = hdd:1
Memory-test set to FULL
Warning: Device list is not verified but still set in the boot string.
console> (enable)
Cisco Intrusion Prevention System Appliance and Module Installation Guide for IPS 7.0
7-12
For more information on ESD-controlled environments, see
1-32.
For the procedure for resetting the IDSM2, see
For the procedure for restoring the application partition, see
page
12-28.
For the procedure for powering the IDSM2 up and down, see
page
7-15.
Catalyst Software, page 7-12
Cisco IOS Software, page 7-13
Chapter 7
Working in an ESD Environment, page
Resetting the IDSM2, page
Installing the IDSM2 System Image,
Powering the IDSM2 Up and Down,
Installing the IDSM2
7-13.
OL-18504-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents