Solder Process; D.5.3 Solder Process; Figure 44. Positioning Solder On Ihs - Intel Q9450 - Core 2 Quad Quad-Core Processor Design Manual

Design guidelines
Table of Contents

Advertisement

16. Place the two pieces of solder in parallel, directly over the thermocouple bead (see
Figure 44)

Figure 44. Positioning Solder on IHS

17. Measure the resistance from the thermocouple end wires again using the DMM
(refer to Section D.5.1.step 2) to ensure the bead is still properly contacting the
IHS.
D.5.3

Solder Process

18. Make sure the thermocouple that monitors the Solder Block temperature is
positioned on the Heater block. Connect the thermocouple to a handheld meter to
monitor the heater block temperature
19. Verify the temperature of the Heater block station has reached 155 °C ±5 °C
before you proceed.
20. Connect the thermocouple for the device being soldered to a second hand held
meter to monitor IHS temperature during the solder process.
90
Case Temperature Reference Metrology
Thermal and Mechanical Design Guidelines

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Q9450 - Core 2 Quad Quad-Core Processor and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents