Download Print this page

ChargePoint Power Block Design Manual page 45

Express plus dc fast charging station

Advertisement

A consistently strong mobile signal is needed before installers can activate the vehicle charging station.
Weak or sporadic signal can affect crucial aspects of the charging station, including:
Accuracy in reporting
l
Ability for drivers to use the mobile app
l
Ability for customer support to troubleshoot problems
l
Support for advanced features such as Power Management or Waitlist
l
A strong signal is also required for the ChargePoint Assure maintenance and management programmes.
ChargePoint stations use mobile data connections to reach ChargePoint cloud services. This allows secure,
PCI-compliant data connections without requiring any other form of Internet connectivity at an install site
or imposing additional network management responsibilities on a site host.
Each station has its own mobile connection.
Connectivity
4
4
40

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Block and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Power link 2000