Download Print this page

ChargePoint Power Block Design Manual page 27

Express plus dc fast charging station

Advertisement

Use wall mount bracket to mark hole locations. Size holes for M8 bolts.
l
WARNING:
If not installed correctly, the ChargePoint charging station may pose a crushing
hazard, leading to death, personal injury or property damage. Always use the provided
Concrete Mounting Template shown pre-installed here, or a ChargePoint-approved surface
mounting solution, to install the ChargePoint charging station. Always install in accordance
with applicable codes and standards using licensed professionals. Non approved
installation methods are performed at the risk of the contractor and void the Limited One-
Year Parts Exchange Warranty.
The Power Link 2000 wall mount anchor bolt pattern appears below.
Mounting Specifications - Walls
22

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Block and is the answer not in the manual?

This manual is also suitable for:

Power link 2000