A pedestal-mount Power Link 2000 also accepts Surface Conduit Entry. The
surface conduit can enter from the pedestal back (a), or approach from one side
and use a 90 degree elbow to join the pedestal back. Use a ChargePoint
approved surface mount template to correctly align anchor bolt locations for
drilling and epoxy. The maximum conduit sizing must still align with the values
described in
Conduit and Wiring
Drainage
Ensure any site slopes, walls or fencing do not trap water around the installation site.
WARNING:
Exposing the ChargePoint® charging components to over 457 mm (18 in) of standing
water could create an electrocution, shock or fire hazard.
If the component has been exposed to standing water, cut power to the component and contact
ChargePoint before the component is powered on.
25
Requirements.