Download Print this page

ChargePoint Power Block Design Manual page 33

Express plus dc fast charging station

Advertisement

Power Link 2000
The Power Link 2000 requires minimum site and service clearances listed below.
Power Link 2000 With Liquid Cooled Cables
Note:
Image not to scale.
Power Link 2000 Without Liquid Cooled Cables
Note:
Image not to scale.
Clearances
28

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Block and is the answer not in the manual?

This manual is also suitable for:

Power link 2000