Download Print this page

ChargePoint Power Block Design Manual page 19

Express plus dc fast charging station

Advertisement

Mounting Specifications - Concrete Pads
The Power Block and Power Link 2000 (in pedestal configuration) can each be installed on either a newly
poured pad or an existing concrete surface. The mounting surface must be smooth and cannot exceed a
slope of 20 mm per metre (0.25 inches per foot).
IMPORTANT:
If an existing pad does not meet the slope requirement given above, then a
localised pad must be poured and levelled to meet the slope requirement.
WARNING:
If not installed correctly, the ChargePoint charging station may pose a crushing
hazard, leading to death, personal injury or property damage. Always use the provided Concrete
Mounting Template shown pre-installed here, or a ChargePoint-approved surface mounting
solution, to install the ChargePoint charging station. Always install in accordance with applicable
codes and standards using licensed professionals. Non approved installation methods are
performed at the risk of the contractor and void the Limited One-Year Parts Exchange Warranty.
Note:
Although new pad installation is the most common mounting method, Surface Conduit Entry (SCE) is
also allowed and described later in this chapter. Contact ChargePoint for the approved mounting hardware
if a site requires an SCE installation, a surface mount template for drilled and epoxied anchor bolts, or low
clearance accommodation (such as a low ceiling parking garage).
Mounting Specifications - Concrete Pads
14

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Block and is the answer not in the manual?

This manual is also suitable for:

Power link 2000