Check and adjustment of downflow air velocity and downflow alarms.
•
Check and adjustment of inflow air velocity and inflow alarms.
•
•
Check of window alarm.
Check of airflow pattern using smoke.
•
A service test report should be issued documenting the "as left" conditions of the cabinet.
Optional test can be performed on request:
Particle test in the working chamber to determine the air quality.
•
KI Discus test to determine the retention in the work opening.
•
•
Sound level test.
Light intensity test – normal light.
•
Light intensity test – UV light.
•
8.2
Working chamber lights, replacement
The general light for the working chamber consists of two LED lights placed between the downflow
filter and the laminator at the top of the working chamber.
To remove the laminator, the two fixing screws, shown on the picture below, must be removed.
Remove the laminator located in top of the work chamber (handle with care). Release the two lamps
from the fixtures by rotating them 90º. Install the new lamps performing the inverse operation.
Product name
Light tube ReVo and ReVo Pro 900
Light tube ReVo and ReVo Pro 1200
Light tube ReVo and ReVo Pro 1500
Light tube ReVo and ReVo Pro 1800
38
Catalogue No.
R1297503
R1297504
R1297505
R1297506
Need help?
Do you have a question about the ReVo and is the answer not in the manual?
Questions and answers