Change Control Tasks; View Current Job Changes - Extreme Networks ISM Provision User Manual

Network infrastructure manager
Table of Contents

Advertisement

Change Control Tasks

The following tasks can be accomplished in the Change Control view of Network
Infrastructure Manager:

• View Current Job Changes

• View Committed, Scheduled, or Saved Jobs
• Delete Scheduled or Saved Jobs
• Create Configuration Version
• Rollback to a Configuration Version
View Current Job Changes
Every change you make in NIM is captured in the current job. If you want to see what
changes have been made that are not yet committed to the ISM Provision server, you
would view the current job changes. You will view the changes in the Current Job
Changes tab of the Change Control view of NIM.
Steps. To view the current job changes:
1 Select the Current Job Changes tab in Change Control view
2 Select the Created, Modified, or Deleted Objects In This Job tab
The three tabs on the Current Job Changes tab are: Created Objects In This Job,
Modified Objects In This Job, and Deleted Objects In This Job. Each tab displays
the object changes that are not yet committed to the ISM Provision server. Choose
the category of changes you wish to view.
3 Select individual objects to view details (if any)
For some objects, more details are listed in the Selected Details panel. Click on the
object, and selected details are displayed in the panel (see Figure 8-1).
Network Infrastructure Manager User Guide
Change Control Tasks
8-3

Advertisement

Table of Contents
loading

Table of Contents