Make sure the air vent of the machine room is away from the sewage pipe, septic tank, and sewage treatment
tank. Keep the machine room under positive pressure to prevent corrosive gas from entering the machine
room to corrode components and circuit boards.
Keep the machine room away from industrial boiler and heating boiler.
The machine room should be on the second floor. Otherwise, the machine room floor should be 600 mm
(23.62 in.) higher than the highest flood level ever recorded.
Make sure there are no cracks or holes in the wall and floor. If there are cable entries in the wall or window,
take proper sealing measures. Ensure that the wall is flat, wear-resistant, and dust-free, which should be up
to the standard for flame retarding, soundproofing, heat absorption, dust reduction, and electromagnetic
shielding.
Keep the door and the window closed to make the machine room sealed.
The steel door is recommended for soundproofing.
Sulfur-containing materials are forbidden.
Keep the air conditioner from blowing wind straight toward the device or blowing water drops from the window
or air vent toward the device.