Start-Up Of The Cbl; Basic Parameterization Of The Units - Siemens SIMOVERT FC Series Operating Instructions Manual

Masterdrives cbc - communication board can-bus
Table of Contents

Advertisement

03.99
5

Start-up of the CBL

Using two
communication
boards
5.1

Basic parameterization of the units

Basic
parameterization for
MASTERDRIVES with
CUMC or CUVC
Siemens AG
6SE7087-6NX84-0GB0
SIMOVERT MASTERDRIVES
If two communication boards are used the CB in the lower letter slot is
the first one. The CB in the higher letter slot is the second one.
The CB parameters of the first communication board are reached with
index 1, the second with index 2; e.g. P711.2 is parameter P711 of the
second communication board.
At chapter "softwiring" transmit and receive channel have to be routed
to the setpoint and actual value channels. The connectors of the first
CB have numbers like 3XXX, the second CB like 8XXX.
If two CBs are used refer to the documentation and function diagrams
of the converter and check the connector numbers.
Optional boards?
CBL? Yes:
P060 = 4
P711 = 0...4
P712 = 0...255
P715 = typ. 350
P716 = typ. 351
P717 = typ. 352
P718 = typ. 353
P918 = 1...64
P060 = 1
P722 = 0...65535
P053 = x
Go on with
softwiring
Fig. 5-1
Parameterization of the "hardware configuration" for MASTERDRIVES
with CUMC or CUVC
Operating Instructions
Function selection "hardware configuration"
CB-Parameter for CBL:
Data transmission rate
Option switch
Scaling parameter A
Scaling parameter V
Scaling parameter Hz
Scaling parameter rotation/min
CC-Link station number
Function selection "leave hardware configuration"
Telegram failure time
Parameterization enable CBL
See next chapter
Start-up of the CBL
5-1

Advertisement

Table of Contents
loading

Table of Contents