Installing On A Swing Gate - Pilz PSEN sl2-IL1-P Operating Manual

Table of Contents

Advertisement

Installation
}
The fastening of safety switch and actuator has to be sufficiently stable to ensure the
proper operation of the safety switch and the actuator.
}
Prevent the safety switch and actuator being exposed to heavy shock or vibration.
}
The mounting surface must have a max. unevenness of 0.5 mm.
}
The actuator must rest flush on the mounting surface.
}
The safety switch and actuator should be installed opposite each other in parallel.
}
Circumvention of the safety switch in a reasonably foreseeable manner must be preven-
ted.
}
The actuator should be installed so it does not present a risk when using the safety gate.
}
Alignment errors of the guard must not adversely affect the safety function of the guard.
8.2

Installing on a swing gate

This chapter shows the graphics of the PSEN sl2‑L‑AL actuator.
Unless stated otherwise, the information also applies to the PSEN sl2‑L‑VA actuator.
Align the actuator flush with the edge of the gate at the
height required and tighten the screws.
Close gate.
Align the mounting bracket flush with the safety switch
and tighten the screws.
Operating Manual PSEN sl2-IL1/2/3-P
1005909-EN-02
Installation of the safety switch and actuator must be concealed.
INFORMATION
Mounting brackets are available as
accessories [
63].
| 36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Psen sl2-il2-pPsen sl2-il3-p

Table of Contents