Commissioning

10
Commissioning
10.1

Visual inspection

}
Check the safety switch and actuator for damage.
Replace the damaged safety switch and actuator.
}
Check that the safety switch and actuator are firmly secured.
Tighten the fixing screws using the appropriate torque.
}
Remove any dirt from the safety switch and actuator.
}
Check that the wiring is correct.
}
Check the offset of the safety switch and actuator.
– Max. lateral offset
– Max. angular offset
– Max. vertical offset
}
Make sure that the sealing areas on the connector and the socket of the connection lines
are not damaged.
}
Check the alignment of the safety switch and actuator and correct it as required.
10.2

Function test

}
Bring the actuator into the safety switch's response range.
When der actuator is detected, a high signal is present at the signal output Y32 and at the
safety outputs 12 and 22.
}
Supply a high signal at the input 31/Y1.
When the guaranteed locking force is reached, the guard locking is deemed to be suc-
cessfully activated. "Lock" LED lights up green.
Function check SDD (if used)
}
Read out the serial numbers of all the connected safety devices.
When the serial numbers of the connected safety devices can be read out, the SDD com-
munication works correctly.
}
Ensure that the supply voltage is connected correctly at A1 and A2.
Operating Manual PSEN sl2-IL1/2/3-P
1005909-EN-02
NOTICE
The safety functions should be checked after initial commissioning and each
time the plant/machine is changed. The safety functions may only be
checked by qualified personnel.