Description of the Upgrade
Installation Procedure for the Upgrade
Step 32. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
the cushioning material touches the front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.
52
Installation Note N5225-90136
Need help?
Do you have a question about the N5224B and is the answer not in the manual?
Questions and answers