Mallinckrodt CT 9000 ADV Installation And Service Manual page 255

Digital injection system
Table of Contents

Advertisement

CT 9000° ADV
Installation
Checklist
Console S/N
|
| |
Power pack S/N
Powerhead S/N
Model Number
|
|
Customer
This Checklist is to be used in conjunction with Chapter 2 and 6 of the Installation and Service Manual.
Refer to Chap. 2 of the Install. and Service Manual.
INSTALLATION PROCEDURE
Inspect Console.
Inspect Power Pack.
Inspect Powerhead.
Inspect Cables and Power Cord.
Inspect each accessory.
Mount components to desired
configuration.
Connect cabling.
Install Pressure Plate Assembly.
Powerhead/Pressure Jacket
Check pressure jacket.
Inspect the ram, seals and heater connector
Check the powerhead pivot movement.
Check powerhead keys.
Check ram.
Check pressure jacket plate latch.
Check the volume indicator LED.
800961-C Nov. 2000
Keyboard Console
Q
Check Console keys and Remote Start
switch.
Electronics Cabinet
Q
Check the volume indicatior LED.
Flow Rate Check
Q
Enter an Injection.
Q
Enable the injection.
Q
Verify display
а
Expected Duration: between 4 and 20
seconds, depending on pressure plate.
Q
Verify Enable light is illuminated.
Q
Verify correct tracking and injecting light is
illuminated.
Q
"Achieved Values" are within
tolerances
Second injection "Achieved Values" are
within tolerances.
Q
Third injection "Achieved Values" are
within tolerances.

Advertisement