Mallinckrodt CT 9000 ADV Installation And Service Manual page 253

Digital injection system
Table of Contents

Advertisement

CT 9000 ADV
| Preventive
Maintenance
Checklist
Base/Elect Cab S/N
Powerhead S/N
|
Model Number
|
Console S/N
Customer
This Checklist is to be used in conjunction with Chapter 6 of Installation and Service Manual 800961.
POWERHEAD
PEDESTAL
VISUAL INSPECTION
VISUAL INSPECTION
Q
1. Check Heater Blanket and Cable.
О
1. Check column assembly.
Я
2. Inspect the pressure jacket.
Q
2. Check the base assembly.
Q
3. Inspect the ram assembly.
C1 4. Check the syringe gripper for proper
OPERATIONAL CHECK OUT
operation.
O15. Check the pivot assembly.
See Chapter 6 for procedures.
Я
6. Check the powerhead cable connector.
1. Power-up Check (Chapter 6).
HO
7. Check the powerhead cable.
2. Power-head/Pressure Jacket check.
Я
8. Checkface-plate assemblies.
CONSOLE
VISUAL INSPECTION
Q
1. Check the console cable.
2. Check the key pad.
Q
3. Check the assembly for damage.
POWER
PACK
VISUAL INSPECTION
1. Check the power cord.
3. Check all connectors.
4. Check that the cover is secure.
800961-C
Nov 00
2. Check the optional and external cables.
3. Console Check.
4. Flow Rate/Check.
5. Pressure Limit Check.
Customer Signature
Date
Service Representative
Date

Advertisement

Table of Contents
loading

Table of Contents