Mallinckrodt CT 9000 ADV Installation And Service Manual page 113

Digital injection system
Table of Contents

Advertisement

EXTERIOR OF COMPONENTS
POWER-UP CHECK
800961-C
Nov. 2000
Perform Steps 1 through 5 of the Installation Procedure located in
Chapter 2.
o
Turn on the unit by first toggling the power pack's power switch
located on the rear of the cabinet. Then push the console power
switch located on the left-handed side of the console.
о
Verify that the white light on the power head turns on briefly in
approximately 10 seconds. The LED located on the power pack
and on the upper right hand corner of the console will glow and the
start up screen will appear in approximately 18 seconds. Verify the
'Registered to' name is correct.
6
Make sure the start up menu (refer to Chapter 2) appears approxi-
mately 15 seconds after start up screen. Enter the control panel
from the start up menu and verify that the time and date displays
are correct.
©)
Exit the control panel. The enable screen should appear.
6-3

Advertisement

Table of Contents
loading

Table of Contents