Mallinckrodt CT 9000 ADV Installation And Service Manual page 100

Digital injection system
Table of Contents

Advertisement

CT 9000 ® ADV Digital Injection System
POSITION CALIBRATION
NOTE:
The Position Calibration must be performed prior to performing the
Pressure Calibration,
Refer to Figure 5-2.
Place the unit in the Calibration Mode (Refer to the Section—Placing Unit
in Calibration Mode). Remove the Pressure Plate Assembly from the
powerhead.
Press [Calibrate Position].
©
Using the Manual Control knob, incrementally move the ram to
align its top to be flush with the face plate (£0.010"). The use of a
straight edge will allow the technician to view the alignment
easier.
©
Press the Set key. The 'Set' key will momentarily turn white to
indicate a successful input.
Press the [Fast] key and [Forward] key to advance the ram to
extend 4.590" (+0.010") from the face plate.
©
Press the 'Set' key again. The CT 9000 will display the prompt
"Position calibration completed! Press EXIT to continue."
Press the [Exit] key to continue with Pressure Calibration.

Advertisement

Table of Contents
loading

Table of Contents