™ M
R
O
ANGER
AST
PERATOR
4.3 Recommended Installation Tools
Table 4-1 lists recommended tools and materials for installation.
Safety Glasses
Hearing Protection
Level (Optional)
Note: Depending on the national and local standards and codes of practice, and the environment, additional
personal protective equipment may be necessary.
4.4 Unpack the Mast System
Unpack and handle the mast as follows:
1. Carefully open shipping container.
2. Remove all loose parts.
3. Ensure all components are included (Section 4.3) and that the required tools (Section
4.3) are readily available.
4. Carefully lift the wheeled bag and other components free from the shipping container.
5. Inspect for any shipping damage. If damage has occurred, notify the carrier.
6. Unzip the wheeled bag and remove the tripod and base tube.
Figure 4-1 Unzip the wheeled bag and remove the tripod and base tube.
4-2
'
M
S
ANUAL
Table 4-1 Tools and Materials Required for Installation
Tools and Materials
Safety Shoes
Hard Hat or Helmet
Plumb Bob (Optional)
Nitrile or Vinyl Gloves
Safety Gloves / Work Gloves
Measuring Tape (Optional)
TP-4549901-G
February 2024