Deployment With Ez Raze™ Option; Install The Top Of The Mast; Figure 4-38 Lock The Upper Clamp And Unlock The Lower Clamp; Figure 4-39 Insert Top Tube From The Top Of The Tripod - Will Burt EXPEDITION RANGER MAST Operator's Manual

Table of Contents

Advertisement

™ M
R
O
ANGER
AST
PERATOR
4.6.2 Deployment with EZ Raze™ Option
Note: If installing the mast at maximum load (40 lb. / 18.1 kg total, 20 lb. / 9 kg per arm), three
people are required. This allows enough people to raise the payload and to steady the payload
arms as the mast is being guyed.
To deploy the mast with the EZ Raze™ option:

4.6.2.1 Install the Top of the Mast

Insert the Top Tube
1. Stand in the operator's quadrant. This area is next to the winch holder and in front of one
of the levels. Lock the upper clamp. See Section 7.5 to check that the clamp is
sufficiently tight. Unlock the lower clamp.
Operator's Quadrant

Figure 4-38 Lock the Upper Clamp and Unlock the Lower Clamp

2. Retrieve a tube from the tube bag. This will be used as the top tube. Insert the top tube
from the top of tripod. Ensure that the white knob, upper clamp, and lower clamp are in a
straight line.
4-18
'
M
S
ANUAL
Lock
Winch
Holder
Insert Tube

Figure 4-39 Insert Top Tube from the Top of the Tripod

Unlock
White Knob
Upper Clamp
Lower Clamp
TP-4549901-G
February 2024

Advertisement

Table of Contents
loading

Table of Contents