Starting/Stopping The Plc Of The Cnc - Mitsubishi Electric MELDAS C6 Programming Manual

Hide thumbs Also See for MELDAS C6:
Table of Contents

Advertisement

1. PLC Development Environment Using GX Developer

1.3.4 Starting/Stopping the PLC of the CNC

Before writing a ladder program, you must stop the PLC of the CNC.
(1) Operation procedure
Perform the following operation from GX Developer to start the operation screen.
[Online] → [Remote operation] or Alt + 6
On the following screen, set "STOP" or "RUN" in the [PLC] part under [Operation] and click
[Execute]. The current status is displayed in [PLC status] under [Connection target information].
(Note) The operation other than "RUN" or "STOP" can not be performed.
The operation is completed when the following dialog appears. Click [OK]. The status after
completion appears in [PLC status] on the remote operation screen displayed behind. If the status
does not change, check whether an alarm is displayed or not on the CNC side.
1.3 Developing PLC Programs
- 16 -
Get other manuals https://www.bkmanuals.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas c64

Table of Contents