Mitsubishi Electric MELDAS C6 Programming Manual page 336

Hide thumbs Also See for MELDAS C6:
Table of Contents

Advertisement

Program example
M340
10
ZP.CLOSE
No. of
Command
steps
10
LD
11
ZP.CLOSE
23
Cautions
(1) Even if the dedicated commands (OPEN, CLOSE, BUFSND, BUFRCV) are executed with the
high-speed PLC, the actual operation will take place at the same timing as the medium-speed
PLC. Thus, the dedicated command should be executed with the medium-speed PLC.
(2) If a connection opened with TCP is closed, and is tried to be opened again within a minute, an
error completion (completion status C017) will occur. Wait a while before opening the connection
again.
(3) If the connection No. is not within the specified range, an error completion (completion status
C1A6) will occur, but the completion device and completion device +1 will not turn ON.
9. Exclusive Commands 1
CLOSE
"U20"
K5
D130
Device
M340
"U20"
K5
- 327 -
Get other manuals https://www.bkmanuals.com
M170
D130
M170

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meldas c64

Table of Contents