Maintenance schedule

The maintenance schedule is a summary of maintenance tasks to be carried out regularly.
Maintenance task
▲ = Check, ■ = Service,
= Clean
Check for leaks, see chapter 10.2 "Exterior leak test" on page 44 .
Screw connections.
"PU" pump.
Clean the dirt trap.
see chapter 10.3 "Cleaning the dirt trap" on page 44 .
Check the makeup function.
see chapter 7.6 "Function test" on page 29 .
Check the system-specific setting values in the controller, see
chapter 9.2.1 "Customer menu" on page 38 .
Mindestbetriebsdruck „P
"P
" safety valve pressure.
SV
Note!
Compare the minimum working pressure with the initial pressure in the diaphragm expansion tank.
If necessary, adjust the initial pressure in the diaphragm expansion tank.
".
0
Fillcontrol Auto — 06.07.2016 - Rev. B
Conditions
Interval
Maintenance
Annually
Operating conditions
Annually
Annually
English — 43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fillcontrol Auto and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

8812310

Table of Contents