ViscoTwin
130 G8
Operation & Maintenance Manual
Published February 23rd, 2023
Address: 345 E. Tulare Avenue Unit E | Visalia, CA 93277 | Phone: +1 (559) 429-4227
Fax: +1 (559) 429-4228 | Email: info@processtec.com | http://processtec.com

Advertisement

Table of Contents
loading

Summary of Contents for PROCESSTEC ViscoTwin 130 G8

  • Page 1 ViscoTwin 130 G8 Operation & Maintenance Manual Published February 23rd, 2023 Address: 345 E. Tulare Avenue Unit E | Visalia, CA 93277 | Phone: +1 (559) 429-4227 Fax: +1 (559) 429-4228 | Email: info@processtec.com | http://processtec.com...
  • Page 2 TABLE OF CONTENTS Page ii PROCESSTEC INC. 2022...
  • Page 3: Table Of Contents

    3.6 Pumping Product with Large Particulates ........35 PROCESSTEC INC. 2022...
  • Page 4 4.6.1 Foreign Material enters Pump Housing ........73 Page iv PROCESSTEC INC. 2022...
  • Page 5 7.1 Maintenance Movies ............119 PROCESSTEC INC. 2022...
  • Page 6 TABLE OF CONTENTS This page intentionally left blank. Page vi PROCESSTEC INC. 2022...
  • Page 7: About Viscotwin Screw Pumps

    Do not stand between a stationary object and a suspended load. LIFTING OBJECTS Indicates heavy objects that can cause muscle strain or back injury. Lifting aids and proper lifting techniques should be used to prevent injury. PROCESSTEC INC. 2022 Page 1...
  • Page 8 WARNING: ANY MAINTENANCE LEVEL 2 PERFORMED ON THIS PUMP BY UNTRAINED PERSONNEL WITHOUT THE EXPRESS WRITTEN CONSENT OF PROCESSTEC WILL RELEASE PROCESSTEC OF ANY LIABILITY AND VOID ANY WARRANTY CLAIMS ON THE PUMP..
  • Page 9: Working Principle

    (3A, EHEDG), and are built with corrosion-resistant materials in accordance with recommendations from US Food and Drug Administration (FDA) and other international food safety governing bodies. Pumps are delivered with a motor, lantern, and framing as standard for easy installation. PROCESSTEC INC. 2022 Page 3...
  • Page 10: General Overview

    1. ABOUT VISCOTWIN SCREW PUMPS 1.3 General Overview Page 4 PROCESSTEC INC. 2022...
  • Page 11: Options

    ViscoTwin Pump Housings are hardened with a DURALOY treatment. The inside surface of the pump housing is always matte. ViscoTwin The general build of all pumps also fulfill OSHA guidelines. PROCESSTEC INC. 2022 Page 5...
  • Page 12: Pump Face Options

    The Dual Port Pump Face uses the same principle as the NPSH pump face. This configuration allows for two lines to conjoin at the pump which reduces piping system complexity, while maintaining the efficiency of the NPSH standard pump face. Page 6 PROCESSTEC INC. 2022...
  • Page 13 DIN 11864-3 (Clamp Union, Varivent Flange Butt Weld Short Pipe Feral Collar Side) NOTE: supplies the Non O-ring / Collar side; the mated O-ring Groove side & clamps are not Processtec ViscoTwin included with the Pump. PROCESSTEC INC. 2022 Page 7...
  • Page 14: Pump Housing Options

    Housing arrangement “FH” -> Spindle arrangement “A” Housing arrangement “HF” -> Spindle arrangement “V” Inwards turning shafts require the PIN arrangement “1” ViscoTwin The most common arrangement for pumps is arrangement FHO3V (see page 96). Page 8 PROCESSTEC INC. 2022...
  • Page 15 1. ABOUT VISCOTWIN SCREW PUMPS Port Direction ViscoTwin G8 also has two general port directions: Discharge to Top, and Discharge to Bottom. Discharge to Top Discharge to Bottom PROCESSTEC INC. 2022 Page 9...
  • Page 16: Elastomer Options

    1.4.4 Elastomer Options Elastomer Selection Table MAX. TEMP MAX. FAT TEMP / STRESS EPDM 140° C 28 bar 120° C 100% 28 bar V70SW 200° C 100% 40 bar PERLAST 200° C 100% 50 bar Page 10 PROCESSTEC INC. 2022...
  • Page 17: Spindle Options

    33 mm 0.317 Liter 0.084 Gal 16.5 mm 2/3" ViscoTwin 44 mm 0.423 Liter 0.112 Gal 22.0 mm 6/7" 130 G8 65 mm 0.623 Liter 0.165 Gal 32.5 mm 1-2/7" Max Pump Head RPM: 3000 rpm. PROCESSTEC INC. 2022 Page 11...
  • Page 18: Mechanical Seal Options

    Different mechanical sealing surfaces and elastomers are available for the pumps. Material and design are selected based on application. ViscoTwin 130 G8 For easy handling, the is designed to use a fully pre-assembled cartridge seal to prevent assembly errors and damages to the sealing surfaces.
  • Page 19 The quench media, in most cases, is city water, single pass. It can be glycerine or vegetable oil recirculated from a quench tank. Sealing Surface: Tungsten Carbide knife edge (TC) PROCESSTEC INC. 2022 Page 13...
  • Page 20: Bearing Housing Options

    • Easier gear oil visual inspection (particulates in the oil, discoloration, etc.) *oil sample testing kits can be ordered at: info@processtec.com The Powder Coated bearing housing is an economic solution made from cast iron. The powder coating is resilient to external weathering, however some wear can show over time.
  • Page 21 The axial forces limit the bearing's lifespan based on P = F / A, where: P = differential pressure F = Axial Force on the Shaft A = Spindle Surface For more details, please consult Section 6.4 "Maximizing Bearing Lifespan" on page 108. PROCESSTEC INC. 2022 Page 15...
  • Page 22 2:2 Standard (Up to 300 psi) 3:1 High Pressure Product Flow (FH) (300 psi to 650 psi) 1:3 High Pressure Product Flow (HF) (300 psi to 650 psi) Page 16 PROCESSTEC INC. 2022...
  • Page 23: Motor Options

    Imperial: (HP x 5252) = RPM x Torque in lb-ft. The torque value of an electric motor is approximately flat between 30 Hz to 60 Hz. Above 60 Hz, the formulas above apply. Below 30 Hz, the loss in torque is very minimal. PROCESSTEC INC. 2022 Page 17...
  • Page 24: Frame Options

    1. ABOUT VISCOTWIN SCREW PUMPS 1.4.9 Frame Options Page 18 PROCESSTEC INC. 2022...
  • Page 25: Performance Tables

    CIP flowrate of 1.8 m/sec (5 ft/sec) for appropriate line cleaning. 1.5.1 Sizing Chart The pump sizing is best accomplished with a proprietary sizing software. For the engineer without access to a sizing program, we created some sizing tables that are ready for download. PROCESSTEC INC. 2022 Page 19...
  • Page 26 STEP 1) Find the field that comes closest to the viscocity and pressure range STEP 2) Find the closest Flow Rate in GPM STEP 3) Determine the RPM on the Pump Shaft STEP 4) Specify the Motor Page 20 PROCESSTEC INC. 2022...
  • Page 27: Water Curves

    Water Curve Performance Charts in US STANDARD can be viewed and/or downloaded from the website here: Processtec https://processtec.com/water-curves-us-standard.html Water Curve Performance Charts in METRIC can be viewed and/or downloaded from the website here: Processtec https://processtec.com/sizing-us-standard.html PROCESSTEC INC. 2022 Page 21...
  • Page 28 1. ABOUT VISCOTWIN SCREW PUMPS This page intentionally left blank. Page 22 PROCESSTEC INC. 2022...
  • Page 29: Installation

    Use these documents to ensure the pump is shipped as ordered & store these documents for future reference. All pumps are labeled with a sticker showing a QR code, the pump model, a serial number, and a Component ID identifying the building plan of the pump at Processtec PROCESSTEC INC. 2022 Page 23...
  • Page 30: Hoisting And Transportation

    Safety Lantern. Using the properly-rated lifting strap, wrap it underneath the lantern. Move one end of the looped strap through the other end, and then cinch down the strap around the Safety Lantern. Page 24 PROCESSTEC INC. 2022...
  • Page 31 Safety Lantern. A proper position on the Safety Lantern will allow you to hoist the assembly in a level position. PROCESSTEC INC. 2022 Page 25...
  • Page 32: Installation

    7. Ensure that the electric wiring can easily be disconnected for maintenance and is not a safety hazard or dirt trap. Page 26 PROCESSTEC INC. 2022...
  • Page 33: Piping Before And After The Pump

    • Too many restricting devices in the suction line like valves, tees, elbows, or other pipe restrictions. • The suction pipe is too long. • Particulates in the product are caught in valves, restricting the flow PROCESSTEC INC. 2022 Page 27...
  • Page 34: Downstream Piping

    14 bar. Pumps equipped with the smaller spindle pitches (consult the options table) have a max discharge pressure of 25 bar (362 psi). The max temperature with standard elastomers is 130° C (266° F). ViscoTwin 130 G8 If the desired discharge pressure can not be met with the due to spindle pitch restriction, the next larger pump model with a smaller spindle pitch needs to be selected.
  • Page 35: Mechanical Seal Connection

    • A small flowmeter (1/4”) to confirm the flow of seal water • A quench tank installation (see Section 6.3 "Quench Design for Recirculating Fluids in Mechanical Seals" on page 107) PROCESSTEC INC. 2022 Page 29...
  • Page 36: Pre-Installation Of Seal Water For Dual Acting Mechanical Seal

    2.7 Pre-Installation of Seal Water for Dual Acting Mechanical Seal When using city water (from the tap), it is advisable to run an in-line filter, to prevent any possible debris or sediment from entering the pump. Page 30 PROCESSTEC INC. 2022...
  • Page 37: Electrical Installation

    For the US and Canada we select NEMA frame motors. For Mexico, Europe and Australia we select IEC motors that meet country spec. Other motor standards are available upon request. It is up to the client to follow the country specific guidelines for electrical installations. PROCESSTEC INC. 2022 Page 31...
  • Page 38 2. INSTALLATION This page intentionally left blank. Page 32 PROCESSTEC INC. 2022...
  • Page 39: Operation

    The soft start allows the pump to ramp up speed over a period of 15 to 30 seconds in a controlled manner while reading the motor amps from the VFD into the PLC. The shear thinning effect is sensed with the decreasing amps indicated by the VFD. PROCESSTEC INC. 2022 Page 33...
  • Page 40: Avoiding Pump Cavitation

    Note that -14.5 psi (- 1 bar) is absolute vacuum on this planet. If the suction line is undersized, hence the NPSH is too low or almost zero, no pumping system exists to provide the desired performance. Page 34 PROCESSTEC INC. 2022...
  • Page 41: Material Selection For Sealing Surfaces

    In case a differential pressure above 300 psi is required for extended operating times, offers Processtec system upgrades up to 600 psi and 375° F. This is limited to selected spindle pitches, therefore limiting max flowrate and min product viscosity. PROCESSTEC INC. 2022 Page 35...
  • Page 42: Cip / Cop Solution

    CIP solution to be pushed through the pump head without creating large pressure drops. The spindles will start spinning by themselves if not operated during in-line cleaning. To protect the outboard seal faces from overheating, the seal water supply should be activated during CIP. Page 36 PROCESSTEC INC. 2022...
  • Page 43: Visual Inspection

    We offer EPDM, FKM, V70SW and Perlast elastomers to address various oil content/ temperature/stress combinations. For more information, check out the Elastomer Options Chart in Subection 1.4.4 "Elastomer Options" on page 10. PROCESSTEC INC. 2022 Page 37...
  • Page 44: Leakage

    O-rings on the Processtec mechanical seal cartridge during maintenance and inspection intervals or repairs. Page 38 PROCESSTEC INC. 2022...
  • Page 45: Scratches In The Pump Housing

    C) The spindles touch the housing at the pump face end when A) and B) are verified and correct. The clearance between spindle tip and housing is too small for the viscosity of the pumped product and the associated rpm. This issue can be addressed with tapered spindles. PROCESSTEC INC. 2022 Page 39...
  • Page 46 3. OPERATION This page intentionally left blank. Page 40 PROCESSTEC INC. 2022...
  • Page 47: Maintenance

    (http:// Processtec processtec.com/viscotwin-overview.html), you will find a variety of content that is helpful for pump maintenance, including links to various Maintenance Movies, General Documents and Manuals, and other useful information. Use the QR Code to the right to access this section on the web page.
  • Page 48: Risk Assessment For Pump Maintenance

    2) Wear Gloves - To prevent burns and cuts. 3) Hands-On Training - Qualified Maintenance Technicians performing ML-2 tasks need to have hands-on training. They need to become familiar with the pump, the required tools, the supporting documents and charts. Page 42 PROCESSTEC INC. 2022...
  • Page 49: Explaining Maintenance Levels

    In case unusual noises occur, the pump needs to be stopped. A maintenance technician needs to inspect the pump for: A) Foreign material in the pump housing B) Damaged mechanical seals C) Damaged or mis-aligned motor coupling D) Damage at the motor, failing motor bearings PROCESSTEC INC. 2022 Page 43...
  • Page 50: Maintenance Level 2 (Ml-2)

    STEP 4) Gapping the Pump In case the spindles touch each other after a pump cleanup because foreign material entered the pump housing, the pump needs to be gapped. Please follow Subsection 4.5.8 "Proper Gapping of Pump" on page Page 44 PROCESSTEC INC. 2022...
  • Page 51: Maintenance Level 3 (Ml-3)

    The gearwheel needs to be moved by one tooth. Timing is always necessary after a bearing exchange. STEP 2) Bearing Fatigue Exchange all bearings with the correct tools only by a specialized shop. For more information on Bearing Fatigue, please see Section 6.4 "Maximizing Bearing Lifespan" on page 108. PROCESSTEC INC. 2022 Page 45...
  • Page 52: Material At Hand, Required Parts & Tools

    Mechanical Seal (Single Acting or Double Acting) 2322 Shaft Sealing Ring (Bearing Housing) 1010 Shaft Sealing Ring (Gear Housing) 2513 O-Ring (BH/GH Large) 2514 O-Ring (BH/GH Small) 2360 Oil Level Sight Gauge 2233 Screw Plug 2249 Coupling Part (Rubber) Page 46 PROCESSTEC INC. 2022...
  • Page 53: Recommended Tools

    68 or 100. For warmer processing environments, we recommend a more viscous oil indicated with numbers 150. For more information on Oils, please see to Section 5.6 "Oils, Grease & Lubrication Recommended" on page 102. PROCESSTEC INC. 2022 Page 47...
  • Page 54: Maintenance Instructions For Ml-2

    STEP 3) Inspect the product contact surfaces for cleanliness STEP 4) Inspect the product contact surfaces for scratches and bruises. STEP 5) Inspect the elastomers for wear and tear, and correct installation. Page 48 PROCESSTEC INC. 2022...
  • Page 55 This can become necessary if foreign material entered the pump, blocked one of the shafts, and the gearwheel slipped. For more information, please see Subsection 4.5.8 "Proper Gapping of the Pump" on page 68. PROCESSTEC INC. 2022 Page 49...
  • Page 56 Pump Housing Pin Configuration (Pos 1, 2 or 3). STEP 2) Re-install the FOUR (4) Hex Screws (Pos. 1016) and torque each of them to 150 Nm. Page 50 PROCESSTEC INC. 2022...
  • Page 57: Complete Pump Disassembly

    FOUR (4) Hex Head Bolts (Pos. 2527). The pump face is still held in place by the Pump Face Alignment Pins (Pos. 2196). You might need a mallet to remove it because it can sit very tight. PROCESSTEC INC. 2022 Page 51...
  • Page 58 Be sure that the Shaft Blocking Tool also engages in the Lantern Window. Page 52 PROCESSTEC INC. 2022...
  • Page 59 B. In the event that the spindles get stuck, simply use a Rubber Mallet to knock them loose. Hit one side, then the other, alternating until driven loose. C. WARNING! DO NOT USE A METAL HAMMER. DOING SO WILL CAUSE DAMAGE! PROCESSTEC INC. 2022 Page 53...
  • Page 60 STEP 5) REMOVING THE SEAL HOUSING A. Remove the FOUR (4) Socket Head Cap Screws (Pos. 2259) from the Seal Housing. B. Remove the Seal Housing (Pos. 2188) that contains the Mechanical Seals (Pos. 2535). Page 54 PROCESSTEC INC. 2022...
  • Page 61 Mechanical Seal (Pos. 2533). B. Grip the Seal Housing, with the Bearing Housing Side facing up, and press the old Mechanical Seals downward, towards the Product Side of the Seal Housing. Now, the old Mechanical Seals are removed. PROCESSTEC INC. 2022 Page 55...
  • Page 62 D. If even small movements are detected, it will require a complete bearing replacement before further operation. E. Inspect both mechanical seals for visible wear and tear. In case the seals are worn, please send it to for refurbishing. Processtec Page 56 PROCESSTEC INC. 2022...
  • Page 63: Complete Pump Assembly

    Reinstall the Lantern Safety Guard STEP 10) Verify that Spindles Spin Freely STEP 11) Check gapping of Spindles STEP 12) Tighten Hex Screws STEP 13) Install Pump Housing STEP 14) Installing Pump Face to Pump Housing PROCESSTEC INC. 2022 Page 57...
  • Page 64 D. Lightly re-install both Hex Head Cap Screws for Mechanical Seal (Pos. 2533) into the Seal Housing (Pos. 2188), and hand tighten to make sure that the seals are held in place. Page 58 PROCESSTEC INC. 2022...
  • Page 65 2536) on the Bearing Housing (Pos. 1001). B. Then tighten all FOUR (4) Socket Head Cap Screws (Pos. 2259) and torque to 15 Nm, securing the Seal Housing and Mechanical Seals to the Bearing Housing (Pos. 1001). PROCESSTEC INC. 2022 Page 59...
  • Page 66 It could have been minimally shifted during the installation. STEP 5) REINSTALLING THE PROTECTION SHIELDS Re-install the TWO (2) Protection Shields (Pos. 2546 & Pos. 2547). Page 60 PROCESSTEC INC. 2022...
  • Page 67 F. Press the Spindles towards the Product Side of the Bearing Housing (Pos. 1001) until they are flush up against the Seal O-Ring of the Mechanical Seals (Pos. 2535). PROCESSTEC INC. 2022 Page 61...
  • Page 68 REMOVAL OF SHAFT BLOCKING TOOL Remove the shaft blocking tool in the lantern area. STEP 9) REINSTALL THE LANTERN SAFETY GUARD Re-install the Lantern Safety Guard (Pos. 3001) with the Cap Nuts for Lantern Safety Guard (Pos. 3002). Page 62 PROCESSTEC INC. 2022...
  • Page 69 STEP 12) TIGHTEN HEX SCREWS Snug tighten both Hex Head Cap Screws for Mechanical Seals (Pos. 2533) on the Seal Housing (Pos. 2188). PROCESSTEC INC. 2022 Page 63...
  • Page 70 Install the Pump Face to the Pump Housing. Verify that both Alignment Pins (Pos. 2196) are in position and O-ring (Pos. 2192) is correctly in place. Tighten the FOUR (4) hex screws (Pos. 2527) to 150 Nm. Page 64 PROCESSTEC INC. 2022...
  • Page 71: Preventative Maintenance Program

    A) Motor Bearings must be properly greased according to the Motor Manufacturer’s recommendations, which is typically every 3 months. Failure to do so could result in the motor not operating at peak performance, and can possibly lead to permanent motor damage or improper motor function. PROCESSTEC INC. 2022 Page 65...
  • Page 72: Check Condition Of O-Rings

    (O-rings for Seal Housing) 4.5.6 Check the Exterior Lip Seals and O-rings on the Mechanical Seals Inspect the Lip Seal (1) and O-Rings (2, 3 & 4) at the locations shown below for signs of damage. Page 66 PROCESSTEC INC. 2022...
  • Page 73: Check Oil Shaft Sealing Rings

    4. MAINTENANCE 4.5.7 Check Oil Shaft Sealing Rings Check the condition of the Oil Shaft Sealing Rings (Pos. 2322 & 1010) on the Bearing Housing (Pos. 1001) and also on the Gear Housing (Pos. 2172). PROCESSTEC INC. 2022 Page 67...
  • Page 74: Proper Gapping Of Pump

    • Remove the Key (Pos. 1183) on the Drive Shaft by using Ear Clamp Pliers. • Drain the Oil. • Loosen the FOUR (4) bolts (Pos. 2258) on the Gear Housing. • Carefully slide down the gear housing. Page 68 PROCESSTEC INC. 2022...
  • Page 75 Measure the gap position S30 with a feeler gauge. Divide that clearance in 2. (For example, if the clearance at S30 was 0.30mm, you will end up with .15mm). This is known as the "half-gap" dimension. PROCESSTEC INC. 2022 Page 69...
  • Page 76 S20. STEP 7) Hand tighten just ONE (1) Socket Head Cap Screw (Pos. 2186). The shaft should be blocked and both spindles turn synchronized. Page 70 PROCESSTEC INC. 2022...
  • Page 77 STEP 10) Fixate the Gear Synchronization Lock Ring (Pos. 2515) while tightening the EIGHT (8) Socket Head Cap Screws (Pos. 2186) to 8 Nm (5.9 lb-ft.). Now you can re-assemble the pump. PROCESSTEC INC. 2022 Page 71...
  • Page 78: Changing Product Flow Direction

    "V to A" or "A to V" OPTION 2 Step 1) Change Rotation from "O to I" or "I to O" Step 2) Switch the Pin Arrangement from "3 to 1" or "1 to 3" Page 72 PROCESSTEC INC. 2022...
  • Page 79: Failures

    4. MAINTENANCE 4.6 Failures 4.6.1 Foreign Material enters Pump Housing STEP 1) Remove Pump Housing. STEP 2) Clean Area. STEP 3) Inspect shaft for axial & radial movement by hand. PROCESSTEC INC. 2022 Page 73...
  • Page 80 STEP 5) Inspect the spindles and housing condition for debris, scars, and crevices. If necessary, gap or time the spindles. STEP 6) Gapping and/or timing can be necessary if spindles need to be replaced. Page 74 PROCESSTEC INC. 2022...
  • Page 81: Tool-Box

    5. TOOL-BOX 5. TOOL-BOX 5.1 Tools ViscoTwin Below are all of the Tools that are available from Processtec for use on the pumps: 5.1.1 ViscoTwin Tools Spindle Wrench_VT104, VT130_G7, G8, G9 for Pos. 2180 CUSTOMER Part # Material Specification REFERENCE #...
  • Page 82 Mounting Cone Shaft Seal Ring Bearing Housing_VT130_G8, G9 CUSTOMER Part # Material Specification REFERENCE # 23068 T0086 NOTES: Pump Drive Shaft Locking Tool_G8, G9 for Pos. 3000/2247 CUSTOMER Part # Material Specification REFERENCE # 21768 NOTES: Page 76 PROCESSTEC INC. 2022...
  • Page 83: General Tools

    Pos. per Torque Table CUSTOMER Part # Material Specification REFERENCE # 21915 1/2" Drive, 16mm 22108 1/2" Drive, 17mm 21857 1/2" Drive, 27mm 21858 1/2" Drive, 30mm 21912 1/2" Drive, 32mm NOTES: Operate on positions per chart. PROCESSTEC INC. 2022 Page 77...
  • Page 84 Hex Socket Screw Driver_G7, G8, G9 for Pos. see Notes CUSTOMER Part # Material Specification REFERENCE # 21913 22405 21914 10mm NOTES: 7mm used on Pos. 3532 8mm used on Pos. 3002 10mm used on Pos. 3533 Page 78 PROCESSTEC INC. 2022...
  • Page 85 Set of Small Hooks for Removal of O-Rings_G7, G8, G9 CUSTOMER Part # Material Specification REFERENCE # 21848 NOTES: Operate on positions per chart Breaker Wrench_G7, G8, G9 for Pos. 4410 CUSTOMER Part # Material Specification REFERENCE # 22488 1/2" Drive, 18" long NOTES: PROCESSTEC INC. 2022 Page 79...
  • Page 86 Grease Tube_G7, G8, G9 for Various Elastomers CUSTOMER Part # Material Specification REFERENCE # 22260 NOTES: Open Spanner (Wrench) 10mm_G7, G8, G9 for Pos. 3002 CUSTOMER Part # Material Specification REFERENCE # 22489 10mm NOTES: Page 80 PROCESSTEC INC. 2022...
  • Page 87: Spare Parts

    5. TOOL-BOX 5.2 Spare Parts ViscoTwin Below is a list of the Spare Parts that are available from Processtec for use on the pumps: 5.2.1 Spare Parts for Pump Housing Spindle Screw_VT104, VT130_G7, G8, G9 Pos. 2180 CUSTOMER Part #...
  • Page 88 12637 316L VT130.65SEH Standard, EH Spindle (Left Handed) 65mm 12638 316L VT130.65S3A Standard, 3A Spindle (Left Handed) 65mm 15920 316L VT130.65HEH Hardened, EH Spindle (Left Handed) 65mm 21780 316L VT130.65H3A Hardened, 3A NOTES: Rotation Direction Page 82 PROCESSTEC INC. 2022...
  • Page 89 12642 316L VT130.65SEH Standard, EH Spindle (Right Handed) 65mm 12641 316L VT130.65S3A Standard, 3A Spindle (Right Handed) 65mm 15922 316L VT130.65HEH Hardened, EH Spindle (Right Handed) 65mm 18460 316L VT130.65H3A Hardened, 3A NOTES: Rotation Direction PROCESSTEC INC. 2022 Page 83...
  • Page 90 Material Specification REFERENCE # 12516 DIN3771-185,6x4,0 12520 EPDM DIN3771-185,6x4,0 NOTES: Pos. 2195, 2196 Dowel Pin for Pump Face & Housing_VT70, VT104, VT130_G7, G8, G9 CUSTOMER Part # Material Specification REFERENCE # 12616 316L DIN7-8h8x16 NOTES: Page 84 PROCESSTEC INC. 2022...
  • Page 91: Spare Parts For Seal Housing

    NOTES: Elastomer Kit - DAMS_VT130_G8, G9 Pos. 2535 EK Part # CUSTOMER REFERENCE # Material Specification 22099 ANGA, SD: 55mm 22100 EPDM ANGA, SD: 55mm 21724 HUHNSEAL, SD: 55mm 22095 EPDM HUHNSEAL, SD: 55mm NOTES: PROCESSTEC INC. 2022 Page 85...
  • Page 92 Mechanical Seal DAMS_VT130_G8, G9 Pos. 2535 CUSTOMER Part # Material Specification REFERENCE # 22088 SIC/SIC FKM HUHNSEAL, SD: 55mm 22089 SIC/SIC EPDM HUHNSEAL, SD: 55mm 21680 TuC/TuCKE FKM HUHNSEAL, SD: 55mm 22090 TuC/TuCKE EPDM HUHNSEAL, SD: 55mm NOTES: Page 86 PROCESSTEC INC. 2022...
  • Page 93: Spare Parts For Bearing Housing

    Shaft Sealing Ring Bearing Housing_VT130_G8, G9 Pos.2322 CUSTOMER Part # Material Specification REFERENCE # 21863 DIN3760-AS 65x80x8 NOTES: Pos. 2536 Dowel Pin for Seal Housing Alignment_VT104, VT130_G8, G9 CUSTOMER Part # Material Specification REFERENCE # 21903 DIN7-8h8x24 NOTES: PROCESSTEC INC. 2022 Page 87...
  • Page 94: Spare Parts For Gear Housing

    CUSTOMER Part # Material Specification REFERENCE # 21767 Alum. DIN910, Size G3/4" NOTES: Oil Level Sight Gauge_VT70, VT104, VT130_G7, G8, G9 Pos. 2360 CUSTOMER Part # Material Specification REFERENCE # 21766 Alum. Size G3/4" NOTES: Page 88 PROCESSTEC INC. 2022...
  • Page 95 19465 DIN3771-278x4,0 NOTES: O-Ring Small for Gear Housing_VT130_G8, G9 Pos. 2514 CUSTOMER Part # Material Specification REFERENCE # 21864 DIN3771-25,5x2,0 NOTES: Gear Oil Bearing Housing VT CUSTOMER Part # Material Specification REFERENCE # 21871 NOTES: PROCESSTEC INC. 2022 Page 89...
  • Page 96: Spare Parts For Drive Train

    Part # Material Specification REFERENCE # 21712 Alum. BS: 1-1/8" NOTES: Size might change due to motor size. Please consult configuration key or contact Processtec Inc. Coupling Spider_VT104, VT130_G8, G9 Pos. 2249 CUSTOMER Part # Material Specification REFERENCE # 7115...
  • Page 97 5. TOOL-BOX W22 Severe Duty Motor Pos. 3003 CUSTOMER Part # Material Specification REFERENCE # Variable NOTES: WEG Severe Duty 25 HP Size might change due to application requirements PROCESSTEC INC. 2022 Page 91...
  • Page 98: Explosion Drawings

    5. TOOL-BOX 5.3 Explosion Drawings Letter Size (8 1/2" x 11") Tabloid Size (11" x 17") Page 92 PROCESSTEC INC. 2022...
  • Page 99: Torque Tables

    5. TOOL-BOX 5.4 Torque Tables Letter Size (8 1/2" x 11") Tabloid Size (11" x 17") PROCESSTEC INC. 2022 Page 93...
  • Page 100: Pump Housing Configuration

    5. TOOL-BOX 5.5 Pump Housing Configuration ViscoTwin 130 G8 Each Pump Housing can be set up for a variety of configuration options to suit particular application. Each Configuration has been uniquely identified with a series of letters and numbers that call out the specific flow direction, shaft rotation, pin positions and spindle arrangements to get the desired output.
  • Page 101 5. TOOL-BOX PROCESSTEC INC. 2022 Page 95...
  • Page 102 5. TOOL-BOX Page 96 PROCESSTEC INC. 2022...
  • Page 103 5. TOOL-BOX PROCESSTEC INC. 2022 Page 97...
  • Page 104 5. TOOL-BOX Page 98 PROCESSTEC INC. 2022...
  • Page 105 5. TOOL-BOX PROCESSTEC INC. 2022 Page 99...
  • Page 106 5. TOOL-BOX Page 100 PROCESSTEC INC. 2022...
  • Page 107 5. TOOL-BOX PROCESSTEC INC. 2022 Page 101...
  • Page 108: Oils, Grease & Lubrication Recommended

    A higher number next to the oil indicates a thicker oil, 68 = thinner while a lower number indicates a thinner oil. Jax-68 is used very commonly in the United States of America, where is located. Processtec Page 102 PROCESSTEC INC. 2022...
  • Page 109 5. TOOL-BOX PROCESSTEC INC. 2022 Page 103...
  • Page 110: Oil Testing Kit (With Form)

    5. TOOL-BOX 5.7 Oil Testing Kit (with Form) Please talk with your oil supplier about an Oil Testing Kit so that you can check and maintain the integrity of the pump oil. Page 104 PROCESSTEC INC. 2022...
  • Page 111: Geek's Corner

    (Pos. 2322). It is strongly recommended to install an oil cooler to maintain the oil temperature at the needle bearings at max 212° F (100° C). ViscoTwin customized oil cooling system for pumps is shown below. Processtec's PROCESSTEC INC. 2022 Page 105...
  • Page 112: Vibration Sensor With Oil Temperature Sensors

    This will allow the pump's bearing to be monitored continuously. Especially for high pressure applications where high axial forces dramatically limit the bearing lifespan, vibration monitoring will prevent unexpected downtime with planable preventative maintenance, making ViscoTwin high pressure pump setups a highly sustainable solution. Page 106 PROCESSTEC INC. 2022...
  • Page 113: Quench Design For Recirculating Fluids In Mechanical Seals

    6. GEEK’S CORNER 6.3 Quench Design for Recirculating Fluids in Mechanical Seals PROCESSTEC INC. 2022 Page 107...
  • Page 114: Maximizing Bearing Lifespan

    Axial Load per Bearing: 7 kN Supply Pressure: 2 bar Operating Temperature: 80° C Radial Load: 3 kN Nc specifications: Slight-typical contamination Total Axial Load: 14 kN Lubrication Viscosity: 100 mm²/s @ 40° C and 40 mm²/s @ 100° C Page 108 PROCESSTEC INC. 2022...
  • Page 115 ‘n’, where ‘n’ is the number of bearings mounted in tandem with the force exerted on the bearing in both radial and axial dimensions. PROCESSTEC INC. 2022 Page 109...
  • Page 116 For these reasons, it is vital to check the bearing oil regu- ViscoTwin larly for the particulates and replace the oil as necessary. All pumps come standard with two magnetic plugs to help collect and trap particulates, keeping the oil cleaner for longer. Page 110 PROCESSTEC INC. 2022...
  • Page 117 Make sure there is very little play when holding the exterior ring and applying force to the side with the larger interior ring • Look for perfectly round roller balls. Any discoloration and dents can be a sign of a bad bearing PROCESSTEC INC. 2022 Page 111...
  • Page 118 As the bearings change temperature, they both expand and experience thermal shock, both of which ser- ve to increase bearing wear and tear. With the rise in operating temperature, the oil also begins to thin, providing less lubrication for the bearings. Page 112 PROCESSTEC INC. 2022...
  • Page 119 6. GEEK’S CORNER Oil Thickness High viscosity oils are more effective at lubricating bearings. They reduce friction between the balls and the outer casing, thus reducing both heat generation and damage caused by parts contacting. PROCESSTEC INC. 2022 Page 113...
  • Page 120 RPM’s over the same time. Furthermore, the RPM’s limits the effectiveness of more viscous oils due to the increased resistance from moving through thick oil, outweighing the benefits of more viscous oil. Page 114 PROCESSTEC INC. 2022...
  • Page 121 6. GEEK’S CORNER Reference Page Pump Diagram HF (Housing In, Face Out) Pump Diagram FH (Face In, Housing Out) PROCESSTEC INC. 2022 Page 115...
  • Page 122 The three bearings shown below (highlighted in red) are in tandem alignment when they share the Axial Force three ways. A single bearing is supporting the opposite direction. 1:3 High Pressure Product Flow (HF) (300 psi to 650 psi) 3:1 High Pressure Product Flow (FH) (300 psi to 650 psi) Page 116 PROCESSTEC INC. 2022...
  • Page 123 ViscoTwin Table 2: An example of 104 Front In /Top Out with two bearings in tandem. PROCESSTEC INC. 2022 Page 117...
  • Page 124: Equipment Commissioning Protocol

    6. GEEK’S CORNER 6.5 Equipment Commissioning Protocol Page 118 PROCESSTEC INC. 2022...
  • Page 125: Appendix

    7. APPENDIX 7. APPENDIX 7.1 Maintenance Movies ViscoTwin In the section of the Processtec web page, you can find a listing ViscoTwin 70, 104, & 130 G7 of Maintenance Movies for the series of pumps (https://processtec.com/viscotwin-104-g7---130-g7.html). You can access all of the movies online by using the QR code to the right, or you can jump directly to a specific topic by using the corresponding QR codes in the following table.
  • Page 126 ViscoTwin 104 G7 Complete Reassembly with Single Acting Mechanical Seal. Runtime 3:40 sec ViscoTwin 104 G7 Disassembly of Single Acting Me- chanical Seal. Runtime 2:39 sec ViscoTwin 104 G7 Simple Timing (synchronization) Runtime 5:43 sec Page 120 PROCESSTEC INC. 2022...
  • Page 127 Big timing through moving gear wheels. Runtime 16:07 sec ViscoTwin 104 G7 Marriage with motor. Runtime 5:16 sec ViscoTwin 104 G7 Manual Cleaning Dis- & Re-As- sembling. Runtime 3:50 sec ViscoTwin 104 G7 Oil Change. Runtime 1:36 sec PROCESSTEC INC. 2022 Page 121...