4. MAINTENANCE
STEP 3)
INSTALLING SEAL HOUSING INTO BEARING
HOUSING
Next, install the Seal Housing (Pos. 2188)
containing both Mechanical Seals onto the
Bearing Housing (Pos. 1001). This involves lining
up two pairs of Alignment Pins.
A. First, align the Seal Housing (Pos. 2188) with
the TWO (2) Alignment Pins for Seal Housing (Pos.
2536) on the Bearing Housing (Pos. 1001).
B. Then tighten all FOUR (4) Socket Head Cap
Screws (Pos. 2259) and torque to 15 Nm, securing
the Seal Housing and Mechanical Seals to the
Bearing Housing (Pos. 1001).
PROCESSTEC INC. 2022
Page 59