PROCESSTEC ViscoTwin 130 G8 Operation & Maintenance Manual page 70

Table of Contents

Advertisement

4. MAINTENANCE
STEP 13)
INSTALL PUMP HOUSING
Verify that the O-ring (Pos. 1088) is correctly
seated and that both Alignment Pins (Pos. 2195)
are installed in the proper locations based on your
pump's Pin Configuration (see Section 5.5 "Pump
Housing Configuration" on page 94). Carefully
slide the Pump Housing (Pos. 2530) onto the
spindles, and then tighten and torque all FOUR (4)
hex screws (Pos. 1016) to 150 Nm.
STEP 14)
INSTALLING PUMP FACE TO PUMP HOUSING
Install the Pump Face to the Pump Housing.
Verify that both Alignment Pins (Pos. 2196) are
in position and O-ring (Pos. 2192) is correctly
in place. Tighten the FOUR (4) hex screws (Pos.
2527) to 150 Nm.
Page 64
PROCESSTEC INC. 2022

Advertisement

Table of Contents
loading

Table of Contents