PROCESSTEC ViscoTwin 130 G8 Operation & Maintenance Manual page 56

Table of Contents

Advertisement

4. MAINTENANCE
Action Steps for Re-assembly of Pump Housing:
STEP 1)
Slide the Pump Housing (Pos. 2530) back into
position. Check that the TWO (2) Pump Housing
Alignment Pins (Pos. 2195) are still in place. If you
removed the pins, please re-install it as required
by your Pump Housing Pin Configuration (Pos 1,
2 or 3).
STEP 2)
Re-install the FOUR (4) Hex Screws (Pos. 1016)
and torque each of them to 150 Nm.
Page 50
PROCESSTEC INC. 2022

Advertisement

Table of Contents
loading

Table of Contents