2. INSTALLATION

2.1 Unpacking

Check the contents and all wrapping when unpacking the pump. Inspect the pump carefully for any
damage that may have occurred during shipping. Immediately report any damage to the carrier. Keep the
protective caps over the pump inlet and outlet in place until the pump is installed.

2.2 Inspection / Technical Documentation

Inspect the pump for visible shipping damages on pump head, lantern with coupling, motor, and frame.
Locate the technical documentation that is shipped with the pump including:
0.
Equipment Recieving Protocol
00.
Pump Shipping Documents Template
1.
Configuration Key
2.
Equipment Commissioning Protocol
3.1
3.1 Pump Housing Photo
3.2
3.2 Spindle Photo
3.3
3.3 Bearing Housing Photo
4.
Spindle and Pin Configuration
ViscoTwin
5.
6.
Spare Parts Catalog (130 G8)
7.
Customer Recommended Tools Catalog
Use these documents to ensure the pump is shipped as ordered & store these documents for future
reference. All pumps are labeled with a sticker showing a QR code, the pump model, a serial number, and
a Component ID identifying the building plan of the pump at
PROCESSTEC INC. 2022
Manual (130 G8)
.
Processtec
2. INSTALLATION
Page 23

Advertisement

Table of Contents
loading

Table of Contents